TCode | Description | Module | Top Module | Component |
---|---|---|---|---|
UCF03 | List of Method Settings/Cons | FIN-SEM-BCS | FIN | SEM-BW |
UCF04 | List of Method Settings/Plan | FIN-SEM-BCS | FIN | SEM-BW |
TCode | Description | Module | Top Module | Component |
---|---|---|---|---|
UCF03 | List of Method Settings/Cons | FIN-SEM-BCS | FIN | SEM-BW |
UCF04 | List of Method Settings/Plan | FIN-SEM-BCS | FIN | SEM-BW |
TCode | Description | Module | Top Module | Component |
---|---|---|---|---|
UCF01 | Applications | FIN-SEM-BCS | FIN | SEM-BW |
UCF02 | Method Categories | FIN-SEM-BCS | FIN | SEM-BW |
UCF03 | List of Method Settings/Cons | FIN-SEM-BCS | FIN | SEM-BW |
UCF04 | List of Method Settings/Plan | FIN-SEM-BCS | FIN | SEM-BW |
UCF05 | Flexible Upload: Method Categories | FIN-SEM-BCS | FIN | SEM-BW |
UCF06 | Currency Translation Keys | FIN-SEM-BCS | FIN | SEM-BW |
UCF07 | Currency Translation Timeframes | FIN-SEM-BCS | FIN | SEM-BW |
UCF08 | Currency Translation Procedure | FIN-SEM-BCS | FIN | SEM-BW |
UCF09 | Exchange Rate Periods Used | FIN-SEM-BCS | FIN | SEM-BW |
UCF10 | Procedure for E/R Determination | FIN-SEM-BCS | FIN | SEM-BW |
UCF6ANSEQ | Sort Activities | FIN-SEM-BCS | FIN | SEM-BW |
TCode | Description | Module | Top Module | Component |
---|---|---|---|---|
UCF03 | List of Method Settings/Cons | FIN-SEM-BCS | FIN | SEM-BW |
UCF04 | List of Method Settings/Plan | FIN-SEM-BCS | FIN | SEM-BW |
UCF05 | Flexible Upload: Method Categories | FIN-SEM-BCS | FIN | SEM-BW |
UCF06 | Currency Translation Keys | FIN-SEM-BCS | FIN | SEM-BW |
UCF07 | Currency Translation Timeframes | FIN-SEM-BCS | FIN | SEM-BW |
UCF08 | Currency Translation Procedure | FIN-SEM-BCS | FIN | SEM-BW |
UCF09 | Exchange Rate Periods Used | FIN-SEM-BCS | FIN | SEM-BW |
UCF10 | Procedure for E/R Determination | FIN-SEM-BCS | FIN | SEM-BW |
UCF6ANSEQ | Sort Activities | FIN-SEM-BCS | FIN | SEM-BW |
UCNUM1 | Maintain Number Range Intervals | FIN-SEM-BCS | FIN | SEM-BW |
Language | Description |
---|---|
中文 | 方法设置/合并清单 |
한국어 | 방법 세팅/연결 리스트 |
Slovenščina | Seznam nastavitev metode/kons |
Hrvatski | Lista postava metode/konsolidacije |
עברית | רשימת קביעות/איחוד שיטה |
Čeština | Seznam nastavení metod/kons. |
Deutsch | Liste der Methodeneinstellungen/Kons |
English | List of Method Settings/Cons |
Français | Liste des options de méthode/Cons. |
Magyar | Módszerbeállítások listája /konsz. |
Italiano | Lista parametrizz. metodi/cons. |
日本語 | 方法設定/連結の一覧 |
Dansk | Liste over metodeopsætninger/kons. |
polski | Lista ustawień dot. metody/kons. |
繁體中文 | 方法設定/合併報表的清單 |
Nederlands | Lijst met methode-instellingen/cons. |
Norsk | Liste over metodeinnstillinger/kons. |
Português | Lista das opções de método/cons. |
Slovenčina | Zoznam nastavení metód/kons. |
Русский | Список парамет. настр. методов/конс. |
Español | Lista parametrizaciones método/cons. |
Türkçe | Yöntem ayarları/konsolidasyon lis. |
Suomi | Luettelo menetelmäasetuksista/kons. |
Svenska | Lista över metodinställn./kons. |
Català | Llista parametritz.mètode/cons. |
AC | 83 |
AIE | 260 |
AP | 1,210 |
BC | 4,024 |
BW | 1,091 |
CA | 10,821 |
CO | 1,733 |
CRM | 27,278 |
CS | 15 |
DI | 40 |
EC | 853 |
EHS | 1,882 |
EP | 377 |
FI | 7,355 |
FIN | 2,609 |
FS | 4,012 |
GRC | 710 |
HAN | 1 |
ICM | 1,543 |
IM | 303 |
IS-A | 569 |
IS-AD | 357 |
IS-B | 1,844 |
IS-CWM | 38 |
IS-DFS | 492 |
IS-EC | 233 |
IS-H | 361 |
IS-HER-CM | 834 |
IS-HMED | 304 |
IS-HT | 314 |
IS-M | 3,306 |
IS-MP | 166 |
IS-OIL | 1,906 |
IS-PRS | 85 |
IS-PS-CA | 152 |
IS-REA | 178 |
IS-T | 76 |
IS-U | 1,961 |
KM | 165 |
LE | 842 |
LO | 3,713 |
MDM | 9 |
MM | 1,028 |
OPU | 169 |
PA | 4,805 |
PE | 787 |
PLM | 382 |
PM | 1,238 |
PP | 1,824 |
PPM | 482 |
PS | 665 |
PSM | 2,183 |
PT | 898 |
PY | 24,824 |
QM | 350 |
RE | 2,439 |
SCM | 88 |
SD | 1,445 |
SLL | 1,578 |
SRM | 1,726 |
SV | 1,412 |
TR | 367 |
WEC | 112 |
WP | 26 |
XAP | 62 |